House Work -- New Closet, and Bathroom Overhaul
The bathroom overhaul includes: painting the wall and ceiling (which were both painted with that crappy builder-grade beige paint), installing bead-board wainscotting, chair rail, new baseboard and shoe molding, and crown molding.
The bathroom is done except for painting over the spackle where the molding is nailed up; that should be done by the end of this weekend.


